This is the year of Nossin FMI’s 40th anniversary. In 2018 we look back at a successfull history characteristic by it’s innovative culture, consistant growth and no-nonsense mentality. “What you [...]
After a well controlled growth in automised production of fine mechanic parts the current productionroom became too small. More machines was not an option, therefore the building nextdoor was [...]
By now Nossin FMI has grown up to be a family company. For years, Hans and his wife Ine ran the company firmly and with pride. However, son Robert has had the ambition to take over from his [...]
Clients imposed increasingly stringent production requirements, for example, the demand for clean products rose. To meet this demand Nossin FMI purchased a washing street with several cleaning [...]
Following the implementation of the 24-hour concept in milling, attention fell to the turning department. Two new Okuma lathes with powered tools were purchased, one of which has a sub-spindle. [...]
In 2003, Nossin FMI was the first in the world to purchase a Hermle 5-axis CNC milling machine with a pallet exchange system and a 6-axis Kuka robot. And as you might have guessed, this machine [...]
In 1999 the then mayor of Laarbeek described the building on the Molenstraat as a real working environment. “Gosh, space is really tight here, although I have to say that gives a friendly [...]
In 1986 and the following years various machines were purchased including the first complete CNC-controlled milling machine. Hans Nossin purchased the building next door, Molenstraat 11a. This [...]
After 7 years in the garage, the company needed new premises to realise its growth ambitions. Metaaldraaierij Nossin therefore moved to an existing building on the Molenstraat 9a in Aarle-Rixtel. [...]
Following the purchase of various machines, conditions in the garage became too cramped. So the work floor was doubled by taking over the entire garage. In this period two employees also joined [...]